The Sandridge project was a real giant with 191,760 solar panels covering an area of 80 hectares. 50 MW of installed capacity was realized in just four months. In addition to the installation of the park, Goldbeck Solar led the planning and execution of the 132 kV substation. In 2017, the project was sold to the final investor, Foresight Solar Fund Ltd.