The Maasvlakte project, situated in an incredibly exposed location right by the sea, posed unique challenges due to its origins as reclaimed land from the open sea. The constant and strong winds in the area made the installation process quite complex. Additionally, as the Smartlog Logistic Centre was fully operational, careful coordination with the tenants was essential to ensure minimal disruption and to stay on schedule.