GOLDBECK SOLAR installed a 749.7 kWp photovoltaic system on a logistics building in Dettelbach. The system has been operating successfully since June 2025.
The solar power generated is supplied directly to the tenant of the facility under a power supply agreement, and excess energy is fed into the public grid. A particular challenge was the technical optimization of the system within the existing infrastructure.