Whitepaper: Co-located gray battery storage
The increasing volatility of the electricity markets, rising negative prices and falling PV capture rates are changing the economic framework conditions for photovoltaic systems. At the same time, the need for scalable flexibility solutions is growing. Gray battery storage systems in co-location offer an effective approach here: they tap into unused grid connection capacities, increase the efficiency of existing infrastructure and can significantly increase the profitability of PV assets.
In our white paper, 8Energies, enspired and GOLDBECK SOLAR jointly show how co-location projects can be economically modelled, optimized on the market side and implemented in a technically reliable manner. The document provides sound insights into business cases, regulatory requirements, optimization logics and tried-and-tested EPC concepts for the integration of BESS into existing PV parks.
The white paper thus provides a comprehensive basis for decision-making for project developers, asset managers, investors and grid operators who want to strategically exploit the potential of grey battery storage.
Download the white paper now to get a complete overview of the opportunities, requirements and technical implementation options for co-located battery storage.