The Sandridge project was a real giant, with 191,760 solar cells on an area of 80 hectares. 50 MW of installed capacity was achieved here in just four months of construction. In addition to installing the park Goldbeck Solar managed the planning and construction of the 132 kV substation. In 2017, the project was sold to the final investor, Foresight Solar Fund Ltd.