The Leek solar plant in the province of Groningen, which was completed in November 2021, has an installed capacity of 28 MWp. Another piece of the puzzle on the road to the energy transition in the Netherlands. The park is south-facing.
No results found.
The Leek solar plant in the province of Groningen, which was completed in November 2021, has an installed capacity of 28 MWp. Another piece of the puzzle on the road to the energy transition in the Netherlands. The park is south-facing.
After seven months Construction time could GOLDBECK SOLAR in November 2021 two more large plants in the Netherlands on the grid bring: Leek in the province of Groningen and Kampen in the province of Overijssel. Both Ground-mounted systems were for for our customer Chint Solar Nederland realized.