Goldbeck Solar Solar Park

Twice as sustainable: energy park with PV and wind power

Duurkenakker energy park is the first joint project for

Goldbeck Solar and Sunvest

With Duurkenakker, Goldbeck Solar is embarking on a special project. From mid-May, not only a photovoltaic system but also a wind farm is to be built on the site. Thanks to its experience, the Hirschberg-based EPC company is confident that it will be able to successfully realize the project.

 

Goldbeck Solar convinces with experience

The Duurkenakker energy park is intended to make a further contribution to sustainable energy generation in the Netherlands and to achieving the targets set out in the national energy agreement. Not only a solar park, but also a wind power plant is to be built on a former agricultural area of around 50 hectares. The Dutch company Sunvest is relying on Goldbeck Solar for the implementation for the first time. The Hirschberg-based EPC company can look back on a long history of successfully completed solar projects, particularly in the Netherlands. “Goldbeck Solar is very familiar with the conditions in the Netherlands. That was one of the reasons why we chose them to realize the Duurkenakker energy park,” explains Bob Schulte from Sunvest.

Coordination of both projects important

By combining photovoltaics and wind on a single site, particular attention is being paid to the coordination of the two projects. This is because the energy park is to be completed within seven months and put into operation in the fall of 2020. This can only be achieved through precise logistics planning. “Although the combination of photovoltaics and wind presents us with logistical challenges, it makes the project all the more exciting. We are looking forward to working with Sunvest and are confident that we will be able to build the energy park within the planned timeframe,” summarizes Tobias Friedrich, Head of Solar Nederland.

Clean electricity for the region

With an installed capacity of 64 MWp, the solar plant will make an important contribution to the Midden-Groningen region and sustainable energy generation in the Netherlands from the end of 2020. The energy park will not only supply 20,000 households with clean electricity, but also save 25,000 tons ofCO2 per year.

kununu Top Company 2025