Bliesdorf II (DE)

The project consisted of 4 sub-projects (Frankenfelde, Kunersdorf II, Herzhorn and Wriezen) and a medium voltage line to a 110 kV substation with a length of approx. 14 km. The sub-projects were put into operation between 11.4.2018 and 11.6.2019.

Project
Bliesdorf II
Country
Germany
Power
21,9 MWp
Start of operation
04/2018 and 06/2019
Inverters
Sungrow
Modules
Astronergy